Bitcoin Mining ASIC Hosting in Dubai
Professional mining infrastructure dedicated to Bitcoin ASIC hosting.
A simple, industrial, and transparent solution to operate mining machines under controlled conditions.
Three operational foundations
for stable and sustainable Bitcoin mining operations
A Clear Conviction
Built on three solid pillars
Energy
A competitive and stable energy cost. Rate: 0.07 USD / kWh, contractually defined.
Infrastructure
Industrial sites designed for continuous operation. Liquid cooling (Hydro), 24/7 monitoring, electrical redundancy.
Process & Governance
Clear contracts, standardized procedures, transparent reporting. An approach inspired by institutional standards.
Bitcoin Mining
Hosting
Based on professional infrastructures.
The facilities are located in areas selected for their energy stability and their ability to support intensive operations, including under demanding climatic conditions.
The hosting environment is designed to allow machines to operate year-round, without interruptions related to heat or environmental constraints.
A Simple and
Transparent Offer
✓ Stable power supply
✓ Liquid cooling (Hydro)
✓ ASIC installation and commissioning
✓ Performance monitoring
✓ Basic maintenance and technical interventions
A Simple,
Long-Term Mission
To provide a reliable infrastructure enabling Bitcoin mining to be operated as a structured, controlled industrial activity.
The objective is not to promise returns, but to offer a stable operational framework that enables rational and sustainable use of mining hardware.
A Structure Designed for
Clarity and Control
✓ Energy pricing defined in advance
✓ No promises of performance or returns
✓ Direct ownership of machines by clients
✓ Documented installation and operational processes
✓ Performance reporting and monitoring
Join the leading player in the market!
Expert Insights
Because deploying mining infrastructure requires real expertise, our teams share hands-on experience and practical recommendations through clear, educational content designed for professional mining operators.
Our blog provides concrete answers to your questions about hosting, infrastructure, energy, equipment, and operational best practices.
STEP 1 – Start Mining Setup
Submit the Start Mining Setup form with your project details. Our team reviews your request and prepares a deployment quote.
STEP 2 – Setup Fee & Contract Preparation
Receive your installation quote along with a secure payment link for the 250 USD contract setup fee. Once paid, we prepare your hosting contract and issue the final invoice.
STEP 3 – Machine Deployment
After invoice settlement, we order your machines, install them on site, and complete configuration and commissioning.
STEP 4 – Mining Starts
Your machines go live and mining begins. Bitcoin rewards are sent directly to your personal wallet.
HEVEA Mining
A Bitcoin mining infrastructure designed for the long term.
A sober and disciplined approach to ASIC hosting, intended for investors and organizations seeking a clear, transparent, and professional solution, without unnecessary complexity.