Create
Your Hosting

Deploy your own mining data center

For clients wishing to go beyond standard hosting, it is possible to create a dedicated mining data center, fully designed according to the needs of the project.

This approach is intended for structures operating a significant number of machines and seeking a tailor-made infrastructure.

End-to-end support

Support covers all the stages required to create an operational mining site.

Sourcing

Identification and selection of the most suitable site for the project.

Assessment

Technical and energy feasibility study prior to launch.

Sizing

Power sizing and electrical connection planning.

Build

Infrastructure design and full installation.

Cooling

Deployment of Hydro cooling systems for continuous performance.

Operations

Commissioning and day-to-day operational management of the site.

Access
conditions

The creation of a dedicated site is offered starting from 200 machines.

This threshold ensures the economic and technical coherence of the project.

Energy
pricing

Within the framework of dedicated hosting, electricity can be offered starting from 3 USD cents per kilowatt-hour, depending on project configuration, installed capacity, and local conditions.

Parameters are assessed on a case-by-case basis.

Management & operations

Once the site is operational, management can be provided according to the client’s needs, with support tailored to each configuration. This includes technical supervision, day-to-day maintenance and operations, energy management, and performance monitoring. The level of involvement is defined contractually to ensure a clear, structured, and controlled framework.

A tailor-made
approach

Each data center is unique.

Design is based on site constraints, client objectives, and technical requirements related to mining.

The objective is to create a stable, scalable, and controlled infrastructure.

Project assessment

The creation of a dedicated hosting solution is subject to a prior confidential assessment.